Three by Three by Three – Installation, Stroud, April 2016
Three by Three by Three Installation, Stroud, April 2016
Situated in a cellar under the Highstreet, constructed site specific in this difficult to access space, the viewers (1-2 at a time), crawled through 3 arches (60cmx90cm) into a dark, damp tunnel to reach a wooden mobile, 3 frames moved by hand, lit, projected animated shadows.
Videos by James Kriszyk